Train 5J86 London Charing Cross to Grove Park C.S.D.

Operated By Southeastern

London Charing Cross

2min Pathing Allowance

Plat 6 FL

d. 1023

London Waterloo (East)

2min Pathing Allowance

p. 1027

p. 1031

London Bridge

1min Pathing Allowance

Plat 6 6

p. 1032

p. 1036

p. 1038

Tanners Hill Junction (Nx)

1min Pathing Allowance

p. 1039

p. 1042

p. 1046

Schedule Info

Departing Tue 09/07/2024
Created Fri 23/02/24 21:02
Validity 03/06/24 until 13/12/2024
Schedule ID P99181 (8907768)
Schedule Type WTT
Duration 00 hrs 42 mins

Train Info

Operated By Southeastern
Timed For 100mph
Power Type EMU
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 24602004
Flow Info London - Hastings Via Tonbridge
Member Info Log In