Train 5J34 London Charing Cross to Grove Park Up C.H.S.

Operated By Southeastern

London Charing Cross

1min Pathing Allowance

Plat 3 SL

d. 0837

London Waterloo (East)

3min Pathing Allowance

p. 0840

p. 0845

London Bridge

2min Pathing Allowance

Plat 7 7

p. 0847

p. 0851

p. 0854

p. 0856

Schedule Info

Departing Thu 11/07/2024
Created Fri 23/02/24 21:02
Validity 03/06/24 until 13/12/2024
Schedule ID P99138 (8907747)
Schedule Type WTT
Duration 00 hrs 32 mins

Train Info

Operated By Southeastern
Timed For 75mph
Power Type EMU
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 24606004
Flow Info London - Maidstone East / Ashford(K)
Member Info Log In