Train 2P47 Bargoed to Penarth

Operated By Transport for Wales

Bargoed

Formed from 2D26

d. 1200

a. 1204

d. 1204

a. 1207

d. 1208

a. 1210

d. 1211

a. 1215

d. 1215

a. 1218

d. 1219

a. 1221

d. 1221

a. 1224

d. 1225

a. 1229

d. 1229

a. 1231

d. 1231

a. 1233

d. 1234

Heath Jn

1min Eng. Allowance

p. 1235

a. 1239

d. 1241

p. 1243

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here
Formed from 2H13

a. 1243

d. 1246

Penarth Curve South Jn

2min Pathing Allowance

p. 1248

a. 1251

d. 1252

p. 1254

Dingle Road

1min Eng. Allowance

a. 1256

d. 1256

Penarth

Then Forming 2R12

a. 1259

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P66067 (6897929)
Schedule Type WTT
Duration 00 hrs 59 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25448000
Flow Info Cardiff Central - Rhymney

Passenger Info

Member Info Log In