Train 2P43 Bargoed to Penarth

Operated By Transport for Wales

Bargoed

Formed from 2D22

d. 1125

a. 1129

d. 1130

a. 1133

d. 1134

a. 1136

d. 1139

a. 1143

d. 1144

a. 1148

d. 1149

a. 1151

d. 1154

a. 1158

d. 1158

a. 1200

d. 1200

a. 1202

d. 1203

Heath Jn

1min Eng. Allowance
1min Pathing Allowance

p. 1204

a. 1209

d. 1211

p. 1213

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here
Formed from 2R10

a. 1213

d. 1216

Penarth Curve South Jn

2min Pathing Allowance

p. 1218

a. 1221

d. 1222

p. 1224

Dingle Road

1min Eng. Allowance

a. 1226

d. 1226

Penarth

Then Forming 2H13

a. 1229

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P66063 (6897927)
Schedule Type WTT
Duration 01 hrs 04 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25448000
Flow Info Cardiff Central - Rhymney

Passenger Info

Member Info Log In