Train 2P25 Bargoed to Penarth

Operated By Transport for Wales

Bargoed

Formed from 2D08

d. 0900

a. 0904

d. 0904

a. 0907

d. 0908

a. 0910

d. 0911

a. 0915

d. 0915

a. 0918

d. 0919

a. 0921

d. 0921

a. 0924

d. 0925

a. 0929

d. 0929

a. 0931

d. 0931

a. 0933

d. 0934

Heath Jn

1min Eng. Allowance

p. 0935

a. 0939

d. 0941

p. 0943

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here
1min Pathing Allowance
Formed from 2H07

a. 0944

d. 0948

p. 0951

Grangetown

1min Eng. Allowance

a. 0952

d. 0953

p. 0956

a. 0958

d. 0958

Penarth

Then Forming 2R06

a. 1000

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P66047 (6897918)
Schedule Type WTT
Duration 01 hrs 00 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25448000
Flow Info Cardiff Central - Rhymney

Passenger Info

Member Info Log In