Train 2P19 Bargoed to Penarth

Operated By Transport for Wales

Bargoed

Formed from 2D04

d. 0814

a. 0816

d. 0817

a. 0819

d. 0819

a. 0822

d. 0823

a. 0825

d. 0826

a. 0830

d. 0830

a. 0833

d. 0834

a. 0836

d. 0836

a. 0839

d. 0840

a. 0844

d. 0844

a. 0846

d. 0846

a. 0848

d. 0849

Heath Jn

1min Eng. Allowance

p. 0850

a. 0854

d. 0856

p. 0859

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 0859

d. 0902

p. 0904

Grangetown

1min Pathing Allowance

a. 0905

d. 0906

p. 0909

Dingle Road

1min Eng. Allowance

a. 0911

d. 0911

Penarth

Then Forming 2D16

a. 0914

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P66042 (6897915)
Schedule Type WTT
Duration 01 hrs 00 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25448000
Flow Info Cardiff Central - Rhymney

Passenger Info

Member Info Log In