Train 2P09 Bargoed to Penarth

Operated By Transport for Wales

Bargoed

Formed from 2D00

d. 0702

a. 0704

d. 0704

a. 0706

d. 0707

a. 0710

d. 0710

a. 0712

d. 0713

a. 0717

d. 0718

a. 0722

d. 0722

a. 0724

d. 0725

a. 0729

d. 0729

a. 0731

d. 0731

a. 0733

d. 0734

Heath Jn

1min Eng. Allowance

p. 0735

a. 0739

d. 0741

p. 0743

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here
Formed from 2D06

a. 0744

d. 0746

p. 0748

Grangetown

2min Pathing Allowance

a. 0749

d. 0750

p. 0754

Dingle Road

1min Eng. Allowance

a. 0756

d. 0756

Penarth

Then Forming 2R02

a. 0759

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P66037 (6897911)
Schedule Type WTT
Duration 00 hrs 57 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25448000
Flow Info Cardiff Central - Rhymney

Passenger Info

Member Info Log In