Train 2L61 Cheltenham Spa to Maesteg

Operated By Transport for Wales

d. 1446

Barnwood Jn.

1min Eng. Allowance

p. 1452

p. 1454

a. 1455

d. 1500

p. 1512

a. 1518

d. 1519

a. 1527

d. 1528

a. 1536

d. 1537

Severn Tunnel Jn

1min Pathing Allowance

Plat 1 ML

a. 1539

d. 1540

p. 1547

p. 1550

a. 1551

d. 1553

p. 1555

p. 1558

p. 1602

Cardiff Central

Diesel Power From Here
Speed Increase to 100mph
Timed for E tonnes from here

a. 1604

d. 1616

p. 1619

a. 1628

d. 1629

a. 1633

d. 1634

a. 1637

d. 1638

a. 1643

d. 1644

a. 1646

d. 1647

a. 1649

d. 1650

a. 1652

d. 1653

a. 1701

d. 1702

a. 1704

d. 1705

a. 1707

Schedule Info

Departing Sat 27/04/2024
Created Wed 13/09/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID P65786 (7190536)
Schedule Type WTT
Duration 02 hrs 21 mins

Train Info

Operated By Transport for Wales
Timed For 100mph
Power Type DMU
Timing Load Class 158 - 175
Service Type Passenger Service (OO)
Service Code 25429000
Flow Info Cardiff - Birmingham
Service ID 2140

Passenger Info

Member Info Log In