Train 2J32 Barry Island to Pontypridd

Operated By Transport for Wales

Barry Island

Formed from 2Y87

d. 2245

a. 2248

d. 2249

a. 2252

d. 2252

a. 2254

d. 2255

a. 2259

d. 2259

a. 2301

d. 2302

a. 2304

d. 2304

p. 2305

a. 2308

d. 2308

Penarth Curve South Jn

1min Eng. Allowance

p. 2309

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 2313

d. 2326

p. 2326

a. 2328

d. 2330

a. 2332

d. 2333

a. 2336

d. 2337

a. 2340

d. 2341

a. 2344

d. 2345

Trefforest

1min Eng. Allowance

a. 2351

d. 2352

a. 2356

Schedule Info

Departing Fri 26/04/2024
Created Sat 23/09/23 00:10
Validity 16/02/24 until 31/05/2024
Schedule ID P65562 (7322495)
Schedule Type WTT
Duration 01 hrs 11 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25442000
Flow Info Barry Island - Cardiff Central

Passenger Info

Member Info Log In