Train 2D44 Penarth to Bargoed

Operated By Transport for Wales

Penarth

Formed from 2P53

d. 1348

a. 1349

d. 1350

p. 1351

a. 1354

d. 1354

Penarth Curve South Jn

1min Eng. Allowance

p. 1355

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here
Then Forming 2P57

a. 1359

d. 1401

p. 1401

a. 1403

d. 1405

p. 1408

a. 1409

d. 1410

a. 1413

d. 1413

a. 1415

d. 1416

a. 1421

d. 1422

a. 1424

d. 1424

a. 1426

d. 1427

a. 1429

d. 1430

a. 1435

d. 1436

a. 1438

d. 1439

a. 1442

d. 1443

Gilfach Fargoed

1min Eng. Allowance

a. 1445

d. 1446

Bargoed

Then Forming 2P69

a. 1450

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P65001 (6897518)
Schedule Type WTT
Duration 01 hrs 02 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25443000
Flow Info Penarth - Cardiff Central

Passenger Info

Member Info Log In