Train 2D22 Penarth to Bargoed

Operated By Transport for Wales

Penarth

Formed from 2P27

d. 1018

a. 1019

d. 1020

p. 1021

Grangetown

1min Eng. Allowance

a. 1024

d. 1024

p. 1026

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 1029

d. 1031

p. 1031

a. 1033

d. 1035

p. 1038

a. 1039

d. 1040

a. 1043

d. 1043

a. 1045

d. 1046

a. 1051

d. 1053

a. 1054

d. 1055

a. 1059

d. 1100

a. 1104

d. 1106

a. 1108

d. 1109

Pengam

1min Eng. Allowance
3min Pathing Allowance

a. 1112

d. 1113

Bargoed

Then Forming 2P43

a. 1121

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P64988 (6897509)
Schedule Type WTT
Duration 01 hrs 03 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25443000
Flow Info Penarth - Cardiff Central

Passenger Info

Member Info Log In