Train 2D06 Penarth to Bargoed

Operated By Transport for Wales

Penarth

Formed from 2P05

d. 0734

a. 0735

d. 0736

p. 0737

a. 0740

d. 0740

Penarth Curve South Jn

1min Eng. Allowance

p. 0741

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here
Then Forming 2P09

a. 0745

d. 0746

p. 0747

a. 0749

d. 0750

p. 0753

a. 0754

d. 0755

a. 0757

d. 0758

a. 0800

d. 0800

a. 0805

d. 0806

a. 0807

d. 0808

a. 0811

d. 0812

a. 0816

d. 0817

a. 0819

d. 0820

Pengam

1min Eng. Allowance

a. 0823

d. 0823

Bargoed

Then Forming 2P21

a. 0828

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P64949 (6897492)
Schedule Type WTT
Duration 00 hrs 54 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25443000
Flow Info Penarth - Cardiff Central

Passenger Info

Member Info Log In