Train 2D02 Penarth to Bargoed

Operated By Transport for Wales

Penarth

Formed from 2P01

d. 0632

a. 0633

d. 0634

p. 0635

a. 0638

d. 0638

Penarth Curve South Jn

1min Eng. Allowance

p. 0639

Cardiff Central

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 0644

d. 0646

p. 0646

a. 0648

d. 0650

p. 0653

a. 0654

d. 0655

a. 0657

d. 0658

a. 0700

d. 0700

a. 0705

d. 0706

a. 0707

d. 0708

a. 0711

d. 0712

a. 0716

d. 0717

a. 0719

d. 0720

Pengam

1min Eng. Allowance

a. 0723

d. 0723

Bargoed

Then Forming 2P13

a. 0728

Schedule Info

Departing Fri 26/04/2024
Created Thu 17/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P64943 (6897489)
Schedule Type WTT
Duration 00 hrs 56 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25443000
Flow Info Penarth - Cardiff Central

Passenger Info

Member Info Log In