Train 2A68 Bridgend to Aberdare

Operated By Transport for Wales

d. 2042

p. 2043

p. 2050

a. 2055

d. 2056

p. 2102

Rhoose Cardiff Int Airport

1min Eng. Allowance

a. 2105

d. 2106

Barry

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 2114

d. 2115

a. 2118

d. 2118

a. 2120

d. 2121

a. 2125

d. 2125

a. 2127

d. 2128

a. 2130

d. 2130

p. 2131

a. 2134

d. 2134

Penarth Curve South Jn

1min Eng. Allowance
2min Pathing Allowance

p. 2135

a. 2142

d. 2143

p. 2144

a. 2146

d. 2147

a. 2149

d. 2150

a. 2153

d. 2154

a. 2157

d. 2158

a. 2201

d. 2202

a. 2208

d. 2209

a. 2212

d. 2214

a. 2220

d. 2221

a. 2226

d. 2227

Mountain Ash

May Stop to Allow Train to Pass

a. 2230

d. 2231

a. 2233

d. 2234

p. 2235

a. 2237

d. 2238

Aberdare Platform 2

1min Eng. Allowance

p. 2240

a. 2242

Schedule Info

Departing Fri 26/04/2024
Created Fri 24/11/23 21:22
Validity 11/12/23 until 31/05/2024
Schedule ID P64709 (7945104)
Schedule Type WTT
Duration 02 hrs 00 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25439000
Flow Info Arriva Trains Wales

Passenger Info

Member Info Log In