Train 2A64 Bridgend to Aberdare

Operated By Transport for Wales

d. 1942

p. 1943

p. 1950

a. 1955

d. 1956

p. 2002

Rhoose Cardiff Int Airport

1min Eng. Allowance

a. 2005

d. 2006

Barry

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 2014

d. 2015

a. 2018

d. 2018

a. 2020

d. 2021

a. 2025

d. 2025

a. 2027

d. 2028

a. 2030

d. 2030

p. 2031

a. 2034

d. 2034

Penarth Curve South Jn

1min Eng. Allowance

p. 2035

a. 2039

d. 2041

p. 2041

a. 2043

d. 2045

a. 2047

d. 2048

a. 2051

d. 2052

a. 2055

d. 2056

a. 2059

d. 2100

a. 2106

d. 2107

a. 2110

d. 2112

a. 2118

d. 2119

a. 2124

d. 2125

Mountain Ash

May Stop to Allow Train to Pass

a. 2128

d. 2129

a. 2131

d. 2132

p. 2133

a. 2135

d. 2136

Aberdare Platform 2

1min Eng. Allowance

p. 2138

a. 2140

Schedule Info

Departing Fri 26/04/2024
Created Fri 24/11/23 21:22
Validity 11/12/23 until 31/05/2024
Schedule ID P64707 (7945103)
Schedule Type WTT
Duration 01 hrs 58 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25439000
Flow Info Arriva Trains Wales

Passenger Info

Member Info Log In