Train 2A24 Bridgend to Aberdare

Operated By Transport for Wales

d. 1042

p. 1043

p. 1050

a. 1055

d. 1056

p. 1102

Rhoose Cardiff Int Airport

1min Eng. Allowance

a. 1105

d. 1106

Barry

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 1114

d. 1115

a. 1118

d. 1118

a. 1120

d. 1121

a. 1125

d. 1125

a. 1127

d. 1128

a. 1130

d. 1130

p. 1131

a. 1134

d. 1134

Penarth Curve South Jn

1min Eng. Allowance

p. 1135

a. 1139

d. 1141

p. 1141

a. 1143

d. 1145

a. 1147

d. 1148

a. 1151

d. 1152

a. 1155

d. 1156

a. 1159

d. 1200

a. 1206

d. 1207

Pontypridd

2min Pathing Allowance

a. 1210

d. 1212

a. 1220

d. 1220

a. 1225

d. 1226

Mountain Ash

May Stop to Allow Train to Pass

a. 1229

d. 1233

a. 1235

d. 1236

p. 1237

a. 1239

d. 1240

Aberdare Platform 2

1min Eng. Allowance

p. 1242

a. 1244

Schedule Info

Departing Fri 26/04/2024
Created Fri 24/11/23 21:22
Validity 11/12/23 until 31/05/2024
Schedule ID P64680 (7945086)
Schedule Type WTT
Duration 02 hrs 02 mins

Train Info

Operated By Transport for Wales
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 25439000
Flow Info Arriva Trains Wales

Passenger Info

Member Info Log In