Train 9P82 Rainham (Kent) to West Hampstead Thameslink

Operated By Thameslink

Rainham (Kent)

Formed from 9P41

d. 1728

Gillingham (Kent)

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here

a. 1732

d. 1734

a. 1737

d. 1738

a. 1741

d. 1742

p. 1743

a. 1744

d. 1745

a. 1750

d. 1750

p. 1752

a. 1757

d. 1758

p. 1800

a. 1801

d. 1801

a. 1803

d. 1804

a. 1806

d. 1807

Stone Crossing

2min Pathing Allowance

a. 1809

d. 1809

Dartford

1min Pathing Allowance

Plat 2 UML

a. 1815

d. 1817

p. 1819

p. 1820

p. 1821

a. 1822

d. 1822

a. 1827

d. 1828

a. 1831

d. 1832

a. 1834

d. 1835

a. 1839

d. 1840

a. 1842

d. 1842

a. 1844

d. 1844

a. 1847

d. 1848

a. 1849

d. 1850

p. 1852

p. 1852

p. 1854

a. 1856

d. 1858

Metropolitan Jn

1min Performance Allowance

p. 1859

p. 1902

a. 1903

d. 1904

a. 1905

d. 1906

a. 1908

d. 1909

St Pancras International

1min Performance Allowance

a. 1912

d. 1913

p. 1916

p. 1917

p. 1918

p. 1920

a. 1921

Schedule Info

Departing Thu 28/03/2024
Created Wed 16/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P51420 (6874962)
Schedule Type WTT
Duration 01 hrs 53 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 22761000
Flow Info Normal Services

Passenger Info

Member Info Log In