Train 5S61 Brighton to Three Bridges Tl Up Depot

Operated By Thameslink

d. 2244

p. 2247

p. 2253

Keymer Jn

3min Pathing Allowance

p. 2253

p. 2259

p. 2259

p. 2304

Three Bridges Signal T288

Stops For Operating Reasons

a. 2306

d. 2306

a. 2317

Schedule Info

Departing Wed 24/04/2024
Created Wed 16/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P50289 (6874581)
Schedule Type WTT
Duration 00 hrs 33 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In