Train 5R59 Three Bridges to Three Bridges Tl Up Depot

Operated By Thameslink

d. 2248

Three Bridges Up Tld Nx

Stops For Operating Reasons

a. 2250

d. 2250

a. 2254

Schedule Info

Departing Thu 28/03/2024
Created Wed 16/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P50071 (6874501)
Schedule Type WTT
Duration 00 hrs 06 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In