Train 5R04 Three Bridges Tl Up Depot to Three Bridges

Operated By Thameslink

d. 0516

Three Bridges Up Tld Nx

Stops For Operating Reasons

SL

a. 0520

d. 0520

a. 0522

Schedule Info

Departing Wed 24/04/2024
Created Wed 16/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P49986 (6874480)
Schedule Type WTT
Duration 00 hrs 06 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In