Train 1H04 London Charing Cross to Hastings

Operated By Southeastern

p. 1720

a. 1722

d. 1724

p. 1726

p. 1729

p. 1731

p. 1732

p. 1734

Petts Wood Jn

1min Pathing Allowance

p. 1737

p. 1740

Sevenoaks

1min Performance Allowance

a. 1747

d. 1749

a. 1757

d. 1759

a. 1804

d. 1805

Wells Tunnel Jn.

1min Performance Allowance

p. 1806

a. 1809

d. 1812

a. 1816

d. 1817

a. 1821

d. 1822

Stonegate

1min Performance Allowance

a. 1827

d. 1828

a. 1833

d. 1834

Robertsbridge

2min Pathing Allowance

a. 1837

d. 1839

a. 1848

d. 1849

a. 1852

d. 1853

a. 1858

d. 1859

p. 1900

Hastings

Then Forming 5H04

a. 1906

Schedule Info

Departing Wed 02/07/2025
Created Mon 20/01/25 21:41
Validity 19/05/25 until 12/12/2025
Schedule ID P19759 (11666733)
Schedule Type WTT
Duration 01 hrs 51 mins

Train Info

Operated By Southeastern
Timed For 100mph
Power Type EMU
Service Type Express Passenger (XX)
Service Code 24602000
Flow Info London - Hastings Via Tonbridge-Peak Trains
Service ID 2105

Passenger Info

Member Info Log In