Train 9N10 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

d. 1801

p. 1802

a. 1804

d. 1804

a. 1808

d. 1808

a. 1811

d. 1812

p. 1814

a. 1815

d. 1816

a. 1818

d. 1819

a. 1820

d. 1821

a. 1823

d. 1824

a. 1826

d. 1826

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1829

d. 1830

p. 1832

p. 1832

p. 1833

p. 1836

a. 1837

d. 1838

West Ealing

2min Pathing Allowance

Plat 3 RL

p. 1840

a. 1845

d. 1845

a. 1848

d. 1849

p. 1850

a. 1852

d. 1853

a. 1855

d. 1855

a. 1857

d. 1858

a. 1901

d. 1902

a. 1905

d. 1906

Taplow

1min Eng. Allowance

a. 1908

d. 1908

a. 1912

Schedule Info

Departing Thu 28/03/2024
Created Wed 15/11/23 20:40
Validity 11/12/23 until 31/05/2024
Schedule ID P11251 (7843789)
Schedule Type WTT
Duration 01 hrs 11 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 25381901
Flow Info Normal Services

Passenger Info

Member Info Log In