Train 9U01 Maidenhead to Abbey Wood (Crossrail)

Operated By Crossrail

d. 1959

a. 2003

d. 2004

a. 2007

d. 2008

a. 2011

d. 2012

a. 2014

d. 2014

West Drayton

1min Performance Allowance

a. 2016

d. 2017

p. 2020

a. 2021

d. 2022

a. 2024

d. 2025

p. 2027

a. 2028

d. 2029

Acton West

1min Eng. Allowance

RL

p. 2030

p. 2035

p. 2036

p. 2037

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 2039

d. 2041

a. 2043

d. 2044

a. 2045

d. 2046

a. 2048

d. 2049

a. 2051

d. 2052

a. 2054

d. 2054

p. 2055

a. 2057

d. 2058

a. 2101

d. 2102

a. 2106

d. 2107

p. 2109

a. 2111

Schedule Info

Departing Sat 27/04/2024
Created Fri 01/12/23 21:02
Validity 16/12/23 until 01/06/2024
Schedule ID P10942 (8026933)
Schedule Type WTT
Duration 01 hrs 12 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381001
Flow Info London Liverpool St - Shenfield (Off Peak)

Passenger Info

Member Info Log In