Train 9U69 Heathrow Terminal 4 to Abbey Wood (Crossrail)

Operated By Crossrail

d. 1345

a. 1349

d. 1351

p. 1354

Stockley Junction

1min Pathing Allowance

RL

p. 1354

p. 1356

Hayes & Harlington

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1357

d. 1358

a. 1400

d. 1401

a. 1403

d. 1404

a. 1405

d. 1406

a. 1407

d. 1408

p. 1409

Acton Main Line

1min Eng. Allowance

a. 1410

d. 1411

p. 1415

p. 1416

p. 1416

a. 1418

d. 1419

a. 1421

d. 1422

a. 1423

d. 1424

a. 1426

d. 1427

a. 1429

d. 1430

a. 1432

d. 1432

p. 1433

a. 1435

d. 1436

a. 1439

d. 1440

a. 1444

d. 1445

p. 1447

a. 1449

Schedule Info

Departing Sat 27/04/2024
Created Fri 01/12/23 21:02
Validity 16/12/23 until 01/06/2024
Schedule ID P09614 (8026817)
Schedule Type WTT
Duration 01 hrs 04 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381202
Flow Info Normal Services

Passenger Info

Member Info Log In