Train 3N63 Old Oak Depot to Maidenhead Reversing Sdgs

Operated By CrossRail

d. 0613

p. 0619

p. 0621

p. 0623

p. 0624

Royal Oak Sidings

Stops For Operating Reasons
Driver Changes Ends

a. 0626

d. 0644

p. 0645

p. 0646

p. 0649

p. 0652

p. 0654

Stockley Junction

4min Pathing Allowance

RL

p. 0654

Slough

1min Eng. Allowance
4min Pathing Allowance

Plat 4 RL

p. 0704

p. 0714

a. 0716

Schedule Info

Departing Thu 28/03/2024
Created Tue 15/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P08979 (6844956)
Schedule Type WTT
Duration 01 hrs 03 mins

Train Info

Operated By CrossRail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 21381008
Flow Info TfL Rail ECS Movements
Member Info Log In