Train 9H16 London Paddington to Heathrow Terminal 4

Operated By Crossrail

d. 0539

p. 0540

p. 0541

p. 0542

a. 0545

d. 0545

p. 0546

a. 0547

d. 0548

a. 0550

d. 0551

Hanwell

1min Pathing Allowance

a. 0552

d. 0553

a. 0556

d. 0557

Hayes & Harlington

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 0559

d. 0600

Heathrow Airport Jn

1min Eng. Allowance

RL

p. 0601

p. 0603

a. 0606

d. 0608

a. 0612

Schedule Info

Departing Fri 29/03/2024
Created Tue 15/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P08919 (6844909)
Schedule Type WTT
Duration 00 hrs 33 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381001
Flow Info London Liverpool St - Shenfield (Off Peak)

Passenger Info

Member Info Log In