Train 2Y89 Heathrow Terminal 5 to London Paddington

Operated By Crossrail

d. 2220

a. 2224

d. 2225

p. 2228

p. 2229

p. 2230

Hayes & Harlington

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 2231

d. 2232

p. 2234

a. 2238

d. 2239

a. 2240

d. 2241

Acton West

1min Eng. Allowance

RL

p. 2242

p. 2246

p. 2247

p. 2248

a. 2250

Schedule Info

Departing Thu 28/03/2024
Created Tue 15/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID P08783 (6844830)
Schedule Type WTT
Duration 00 hrs 30 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381202
Flow Info Normal Services

Passenger Info

Member Info Log In