Train 9W18 Heathrow Terminal 5 to Shenfield

Operated By Crossrail

p. 1529

p. 1530

Hayes & Harlington

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1531

d. 1532

p. 1534

a. 1538

d. 1539

a. 1540

d. 1541

Acton West

1min Eng. Allowance

RL

p. 1542

p. 1547

a. 1551

d. 1552

a. 1554

d. 1555

a. 1556

d. 1557

a. 1559

d. 1600

a. 1605

d. 1605

a. 1610

d. 1611

a. 1613

d. 1613

a. 1615

d. 1615

p. 1616

a. 1617

d. 1618

a. 1620

d. 1620

a. 1623

d. 1623

a. 1625

d. 1625

a. 1627

d. 1627

a. 1630

d. 1631

a. 1633

d. 1634

a. 1636

d. 1637

Brentwood

1min Pathing Allowance

a. 1640

d. 1641

a. 1646

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID P04120 (10471392)
Schedule Type WTT
Duration 01 hrs 26 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381202
Flow Info Normal Services

Passenger Info

Member Info Log In