Train 9U97 Reading to Abbey Wood (Crossrail)

Operated By Crossrail

d. 1359

p. 1400

a. 1404

d. 1404

a. 1410

d. 1411

a. 1414

d. 1414

a. 1417

d. 1417

a. 1420

d. 1421

a. 1425

d. 1425

West Drayton

1min Performance Allowance

a. 1429

d. 1430

p. 1433

a. 1434

d. 1435

Southall

1min Pathing Allowance

Plat 4 RL

a. 1438

d. 1439

p. 1442

a. 1444

d. 1445

Acton West

1min Eng. Allowance

RL

p. 1446

p. 1450

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1454

d. 1456

a. 1458

d. 1459

a. 1500

d. 1501

a. 1503

d. 1504

a. 1509

d. 1509

a. 1512

d. 1513

a. 1516

d. 1517

a. 1521

d. 1522

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID P04091 (10471363)
Schedule Type WTT
Duration 01 hrs 27 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381001
Flow Info London Liverpool St - Shenfield (Off Peak)

Passenger Info

Member Info Log In