Train 9U63 Maidenhead to Abbey Wood (Crossrail)

Operated By Crossrail

d. 0743

a. 0745

d. 0746

a. 0748

d. 0749

a. 0752

d. 0753

a. 0756

d. 0756

a. 0758

d. 0759

West Drayton

1min Performance Allowance

a. 0801

d. 0802

p. 0805

a. 0806

d. 0807

a. 0809

d. 0810

p. 0812

a. 0814

d. 0815

Acton West

1min Eng. Allowance

RL

p. 0816

p. 0820

Westbourne Park Cs

Stops For Operating Reasons
Booked To Wait

a. 0822

d. 0825

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 0827

d. 0829

a. 0831

d. 0832

a. 0833

d. 0834

a. 0836

d. 0837

a. 0841

d. 0842

a. 0845

d. 0846

a. 0849

d. 0849

a. 0853

d. 0853

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID P04034 (10471306)
Schedule Type WTT
Duration 01 hrs 14 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 25381001
Flow Info London Liverpool St - Shenfield (Peak)

Passenger Info

Member Info Log In