Train 9U51 Maidenhead to Abbey Wood (Crossrail)

Operated By Crossrail

d. 1159

a. 1203

d. 1204

a. 1207

d. 1208

a. 1211

d. 1212

a. 1214

d. 1214

West Drayton

2min Pathing Allowance

a. 1216

d. 1217

p. 1221

Hayes & Harlington

1min Pathing Allowance

a. 1222

d. 1223

a. 1227

d. 1227

p. 1229

a. 1231

d. 1232

Acton West

1min Eng. Allowance

RL

p. 1233

p. 1237

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1240

d. 1241

a. 1243

d. 1244

a. 1245

d. 1246

a. 1248

d. 1249

a. 1254

d. 1254

a. 1257

d. 1258

a. 1301

d. 1302

a. 1306

d. 1307

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID P04014 (10471286)
Schedule Type WTT
Duration 01 hrs 12 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381001
Flow Info London Liverpool St - Shenfield (Off Peak)

Passenger Info

Member Info Log In