Train 9N84 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

a. 1704

d. 1704

a. 1708

d. 1708

a. 1711

d. 1712

a. 1715

d. 1716

a. 1720

d. 1721

a. 1723

d. 1724

a. 1725

d. 1726

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1728

d. 1730

p. 1733

p. 1736

a. 1737

d. 1738

West Ealing

2min Pathing Allowance

Plat 3 RL

p. 1740

a. 1744

d. 1745

a. 1748

d. 1749

p. 1750

a. 1752

d. 1752

a. 1754

d. 1755

a. 1757

d. 1757

a. 1800

d. 1801

a. 1804

d. 1805

Taplow

1min Eng. Allowance

a. 1807

d. 1807

a. 1811

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID P03840 (10471108)
Schedule Type WTT
Duration 01 hrs 10 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 25381901
Flow Info Normal Services

Passenger Info

Member Info Log In