Train 9N62 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

a. 1603

d. 1603

a. 1607

d. 1607

a. 1610

d. 1611

a. 1614

d. 1615

a. 1620

d. 1621

a. 1623

d. 1624

a. 1625

d. 1626

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1628

d. 1630

Ladbroke Grove

3min Pathing Allowance

RL

p. 1633

p. 1639

a. 1640

d. 1641

p. 1642

a. 1645

d. 1646

a. 1649

d. 1650

p. 1651

a. 1653

d. 1653

a. 1655

d. 1656

a. 1658

d. 1658

a. 1701

d. 1702

a. 1705

d. 1706

Taplow

1min Eng. Allowance

a. 1708

d. 1708

a. 1712

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID P03834 (10471102)
Schedule Type WTT
Duration 01 hrs 12 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 25381901
Flow Info Normal Services

Passenger Info

Member Info Log In