Train 9N14 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

a. 2319

d. 2319

a. 2323

d. 2323

a. 2326

d. 2327

a. 2330

d. 2331

a. 2336

d. 2337

a. 2339

d. 2340

a. 2341

d. 2342

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 2344

d. 2348

p. 2351

p. 2354

a. 2355

d. 2358

p. 0001

a. 0002

d. 0003

a. 0006

d. 0007

p. 0008

a. 0010

d. 0010

a. 0012

d. 0013

a. 0015

d. 0015

Slough

1min Eng. Allowance
2min Pathing Allowance

Plat 4 RL

a. 0018

d. 0019

p. 0028

a. 0029

Schedule Info

Departing Thu 13/03/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID P03822 (10471089)
Schedule Type WTT
Duration 01 hrs 13 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381901
Flow Info Normal Services

Passenger Info

Member Info Log In