Train 9N06 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

a. 2250

d. 2250

a. 2254

d. 2254

a. 2257

d. 2258

a. 2301

d. 2302

a. 2307

d. 2308

a. 2310

d. 2311

a. 2312

d. 2313

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 2315

d. 2318

p. 2321

p. 2324

a. 2325

d. 2326

p. 2327

a. 2330

d. 2330

a. 2333

d. 2334

p. 2335

a. 2337

d. 2337

a. 2339

d. 2340

a. 2342

d. 2342

p. 2344

a. 2346

d. 2349

p. 2350

a. 2352

d. 2353

Taplow

1min Eng. Allowance

a. 2355

d. 2355

p. 2358

a. 2359

Schedule Info

Departing Tue 04/02/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID P03818 (10471084)
Schedule Type WTT
Duration 01 hrs 12 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381901
Flow Info Normal Services

Passenger Info

Member Info Log In