Train 2W06 Harwich International to Cambridge

Operated By Greater Anglia

d. 0745

Parkeston Goods Junction

May Stop to Allow Train to Pass

p. 0746

a. 0750

d. 0751

a. 0756

d. 0757

Manningtree North Jn

2min Eng. Allowance

p. 0800

Ipswich Halifax Junction

3min Pathing Allowance

DL

p. 0810

a. 0815

d. 0819

p. 0823

a. 0826

d. 0827

Stowmarket

Diesel Power From Here
Speed Increase to 100mph
Timed for 755 tonnes from here

a. 0831

d. 0834

p. 0837

a. 0842

d. 0842

Thurston

1min Eng. Allowance

a. 0847

d. 0848

a. 0854

d. 0858

Kennett

1min Performance Allowance

a. 0907

d. 0908

p. 0913

a. 0917

d. 0918

Dullingham

1min Eng. Allowance

a. 0922

d. 0923

p. 0937

a. 0940

Schedule Info

Departing Tue 09/07/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID L71104 (8832572)
Schedule Type WTT
Duration 01 hrs 55 mins

Train Info

Operated By Greater Anglia
Timed For 100mph
Power Type EMU
Timing Load Class 755
Service Type Passenger Service (OO)
Service Code 21894002
Flow Info Harwich P Quay - Bury St Edmonds/Cambridge/Peterborough

Passenger Info

Member Info Log In