Train 3G62 Bristol Parkway to Cheltenham Spa

Operated By GWR

Bristol Parkway

1min Pathing Allowance

d. 0439

p. 0445

Yate

Booked To Wait

a. 0448

d. 0451

p. 0457

Standish Jn

1min Eng. Allowance
6min Pathing Allowance

p. 0505

Gloucester Yard Jn

1min Pathing Allowance

p. 0517

p. 0519

Cheltenham Spa

Stops For Operating Reasons

a. 0524

d. 0531

Alstone C. Sidings

Driver Changes Ends

a. 0533

d. 0548

a. 0550

Schedule Info

Departing Fri 29/03/2024
Created Wed 27/12/23 20:40
Validity 15/01/24 until 31/05/2024
Schedule ID L67030 (8230268)
Schedule Type WTT
Duration 01 hrs 11 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 25390003
Flow Info London - Cheltenham
Member Info Log In