Train 2K90 Reading to Newbury

Operated By GWR

d. 0846

p. 0848

p. 0849

Theale

Diesel Power From Here
Speed Increase to 90mph
Timed for T tonnes from here

a. 0852

d. 0853

a. 0858

d. 0859

Thatcham

Electric Power From Here
Speed Increase to 110mph
Timed for 387 tonnes from here
1min Eng. Allowance

a. 0905

d. 0906

a. 0912

Schedule Info

Departing Fri 29/03/2024
Created Wed 06/09/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID L66508 (7143422)
Schedule Type WTT
Duration 00 hrs 26 mins

Train Info

Operated By GWR
Timed For 110mph
Power Type EMU
Timing Load Class 387
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 25519007
Flow Info Reading - Newbury - Bedwyn

Passenger Info

Member Info Log In