Train 1P38 Great Malvern to London Paddington

Operated By GWR

d. 1632

a. 1634

d. 1635

p. 1637

Henwick

1min Eng. Allowance

p. 1641

a. 1644

d. 1645

a. 1648

d. 1653

p. 1654

Norton Jn

May Stop to Allow Train to Pass

p. 1656

a. 1657

d. 1659

a. 1703

d. 1705

Evesham

May Stop to Allow Train to Pass

a. 1711

d. 1714

a. 1719

d. 1721

a. 1731

d. 1748

a. 1755

d. 1757

p. 1801

Charlbury

May Stop to Allow Train to Pass

a. 1805

d. 1807

Hanborough

1min Eng. Allowance
2min Pathing Allowance

a. 1813

d. 1814

Wolvercote Jn

May Stop to Allow Train to Pass

UML

p. 1821

p. 1824

a. 1826

d. 1832

p. 1834

Kennington Jn

1min Eng. Allowance

p. 1835

p. 1841

Didcot Parkway

Electric Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

Plat 5 ML

a. 1843

d. 1845

p. 1846

Goring & Streatley

1min Eng. Allowance

ML

p. 1851

p. 1857

a. 1858

d. 1903

p. 1904

p. 1907

p. 1911

p. 1914

p. 1917

p. 1917

p. 1918

Acton West

1min Eng. Allowance
2min Pathing Allowance

ML

p. 1920

p. 1926

p. 1926

p. 1927

a. 1929

Schedule Info

Departing Fri 29/03/2024
Created Wed 06/09/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID L65660 (7142608)
Schedule Type WTT
Duration 02 hrs 57 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25392003
Flow Info London - Worcester/Hereford
Service ID 7456

Passenger Info

Member Info Log In