Train 1P24 Great Malvern to London Paddington

Operated By GWR

d. 0954

a. 0956

d. 0957

Newland East Signal Box

1min Eng. Allowance
1min Pathing Allowance

p. 0959

p. 1005

a. 1007

d. 1008

a. 1011

d. 1016

p. 1017

p. 1019

a. 1020

d. 1022

a. 1026

d. 1028

a. 1034

d. 1035

a. 1041

d. 1042

a. 1052

d. 1054

a. 1100

d. 1102

p. 1106

a. 1110

d. 1111

Hanborough

1min Eng. Allowance

a. 1117

d. 1119

p. 1124

p. 1126

a. 1128

d. 1132

p. 1134

Kennington Jn

1min Eng. Allowance

p. 1135

p. 1141

Didcot Parkway

Electric Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

Plat 5 ML

a. 1143

d. 1145

p. 1146

Goring & Streatley

1min Eng. Allowance

ML

p. 1151

p. 1156

a. 1158

d. 1200

p. 1201

p. 1204

p. 1207

p. 1210

p. 1213

p. 1214

p. 1215

Acton West

1min Eng. Allowance

ML

p. 1216

p. 1220

p. 1220

p. 1221

a. 1223

Schedule Info

Departing Thu 28/03/2024
Created Wed 06/09/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID L65648 (7142596)
Schedule Type WTT
Duration 02 hrs 29 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25392003
Flow Info London - Worcester/Hereford
Service ID 7428

Passenger Info

Member Info Log In