Train 1K35 Bedwyn to London Paddington

Operated By GWR

d. 2042

a. 2047

d. 2048

a. 2051

d. 2052

Newbury

Electric Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here

a. 2058

d. 2101

a. 2104

d. 2105

Theale

1min Eng. Allowance

a. 2112

d. 2113

p. 2117

p. 2118

a. 2120

d. 2123

p. 2124

p. 2127

p. 2131

p. 2134

p. 2137

Heathrow Airport Jn

1min Pathing Allowance

ML

p. 2138

Southall

1min Pathing Allowance

Plat 2 ML

p. 2140

Acton West

1min Eng. Allowance

ML

p. 2143

p. 2146

Portobello Jn (London)

2min Pathing Allowance

3

p. 2147

p. 2151

a. 2152

Schedule Info

Departing Fri 29/03/2024
Created Thu 12/10/23 20:01
Validity 11/12/23 until 31/05/2024
Schedule ID L65538 (7582196)
Schedule Type WTT
Duration 01 hrs 10 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25517005
Flow Info London - Bedwyn/Newbury
Service ID 2428

Passenger Info

Member Info Log In