Train 1G29 London Paddington to Worcester Shrub Hill

Operated By GWR

d. 1933

p. 1934

p. 1935

p. 1936

p. 1938

p. 1940

p. 1941

p. 1945

p. 1948

Twyford

1min Eng. Allowance

Plat 1 ML

p. 1951

p. 1954

a. 1956

d. 1958

p. 1959

Goring & Streatley

1min Eng. Allowance

ML

p. 2004

a. 2010

d. 2012

p. 2017

p. 2019

Uffington (Oxfordshire)

1min Eng. Allowance

p. 2020

Swindon

Diesel Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

a. 2028

d. 2030

p. 2032

a. 2041

d. 2042

p. 2052

a. 2056

d. 2058

Stonehouse

1min Eng. Allowance

a. 2101

d. 2103

Standish Jn

1min Eng. Allowance

p. 2106

p. 2113

p. 2114

Gloucester

Driver Changes Ends

a. 2115

d. 2124

p. 2125

p. 2126

a. 2131

d. 2133

a. 2139

d. 2141

Abbotswood Jn

1min Eng. Allowance
6min Pathing Allowance

p. 2149

p. 2200

p. 2204

a. 2206

Schedule Info

Departing Thu 28/03/2024
Created Wed 06/09/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID L65499 (7142458)
Schedule Type WTT
Duration 02 hrs 33 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type EMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25390003
Flow Info London - Cheltenham
Service ID 3329

Passenger Info

Member Info Log In