Train 2L85 Peterborough to Colchester

Operated By Greater Anglia

Peterborough

Formed from L19749

d. 2146

p. 2147

p. 2150

a. 2153

d. 2154

p. 2157

Three Horse Shoes

1min Eng. Allowance

p. 2158

p. 2203

a. 2204

d. 2205

p. 2207

p. 2209

a. 2212

d. 2213

Manea Signal Ca924

1min Eng. Allowance

p. 2216

p. 2222

a. 2225

d. 2226

p. 2227

a. 2233

d. 2234

p. 2241

Kennett

1min Eng. Allowance

p. 2244

a. 2254

d. 2255

p. 2306

Stowmarket

Electric Power From Here
Speed Increase to 100mph
Timed for 755 tonnes from here
1min Eng. Allowance

a. 2309

d. 2310

p. 2318

p. 2319

a. 2321

d. 2322

p. 2323

Manningtree

1min Eng. Allowance

a. 2330

d. 2331

Colchester

Then Forming 3L85

a. 2340

Schedule Info

Departing Thu 28/03/2024
Created Sat 19/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID L19749 (6975266)
Schedule Type WTT
Duration 01 hrs 54 mins

Train Info

Operated By Greater Anglia
Timed For 100mph
Power Type DMU
Timing Load Class 755
Service Type Passenger Service (OO)
Service Code 21894002
Flow Info Harwich P Quay - Bury St Edmonds/Cambridge/Peterborough

Passenger Info

Member Info Log In