Train 2J52 East Croydon to London Bridge

Operated By Southern

d. 1822

Windmill Bridge Jn

2min Pathing Allowance

SL

p. 1823

a. 1827

d. 1828

a. 1830

d. 1830

a. 1833

d. 1833

Streatham Common

3min Pathing Allowance

a. 1835

d. 1836

a. 1842

d. 1843

a. 1846

d. 1847

a. 1850

d. 1851

a. 1852

d. 1853

a. 1855

d. 1856

a. 1858

d. 1858

p. 1859

a. 1900

d. 1901

p. 1902

p. 1903

p. 1904

a. 1906

Schedule Info

Departing Thu 28/03/2024
Created Wed 16/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID L16940 (6872599)
Schedule Type WTT
Duration 00 hrs 44 mins

Train Info

Operated By Southern
Timed For 100mph
Power Type EMU
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 24787000
Flow Info London - South London Metro Via Peckham Rye

Passenger Info

Member Info Log In