Train 3J33 Harringay Up Rev Sdgs to Peterborough L.I.P.

Operated By GBRf, Runs Only If Required

SL2

p. 1541

Bowes Park

4min Pathing Allowance

p. 1544

Gordon Hill

3min Pathing Allowance

p. 1553

Ponsbourne Tunnel Sig K891

1min Eng. Allowance
1min Pathing Allowance

p. 1602

Hertford North

1min Pathing Allowance

Plat 2 DL

p. 1609

p. 1618

p. 1619

p. 1620

p. 1625

p. 1638

Huntingdon

2min Eng. Allowance

Plat 3 SL

p. 1653

Holme Jn.

Booked To Wait

FL

a. 1706

d. 1712

p. 1719

Schedule Info

Departing Sun 06/07/2025
Created Tue 18/02/25 21:21
Validity 18/05/25 until 07/12/2025
Schedule ID H53281 (11974737)
Schedule Type WTT
Duration 01 hrs 50 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 715
Service Type Departmental (DD)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In