Train 3J33 Harringay Up Rev Sdgs to Peterborough L.I.P.

Operated By GBRf, Runs Only If Required

SL2

p. 1541

p. 1548

Potters Bar

2min Pathing Allowance

p. 1552

Hatfield

1min Pathing Allowance

p. 1559

p. 1607

Woolmer Green Jn.

1min Pathing Allowance

SL

p. 1610

Stevenage

1min Pathing Allowance

p. 1615

p. 1621

p. 1634

Huntingdon

2min Eng. Allowance

Plat 3 SL

p. 1649

Holme Jn.

Booked To Wait

FL

a. 1702

d. 1712

p. 1719

Schedule Info

Departing Sun 06/07/2025
Created Tue 18/02/25 21:21
Validity 18/05/25 until 07/12/2025
Schedule ID H53277 (11974736)
Schedule Type WTT
Duration 01 hrs 50 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 715
Service Type Departmental (DD)
Characteristics Runs as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In