Train 3J30 Peterborough L.I.P. to Harringay Up Rev Sdgs

Operated By GBRf, Runs Only If Required

p. 1053

p. 1055

p. 1112

p. 1127

Biggleswade

1min Eng. Allowance

p. 1130

Hitchin

2min Eng. Allowance

Plat 1 SL

p. 1141

p. 1148

p. 1149

p. 1150

Molewood Junction

1min Eng. Allowance

p. 1157

p. 1215

p. 1217

Schedule Info

Departing Sun 06/07/2025
Created Tue 21/01/25 21:42
Validity 18/05/25 until 07/12/2025
Schedule ID H53258 (11680050)
Schedule Type WTT
Duration 01 hrs 34 mins

Train Info

Operated By GBRf
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 715
Service Type Departmental (DD)
Characteristics Runs as required
Service Code 54761000
Flow Info GB Railfreight ( + seasonal RHTT and SITT)
Member Info Log In