Train 6V54 Hither Green Down Recp. to Paddn Yd Marcon Topmix

Operated By DB Cargo, Runs Only If Required

Hither Green

Crew Change (if necessary)

Plat 3 SL

a. 0446

d. 0447

p. 0449

p. 0451

p. 0456

p. 0500

p. 0506

p. 0507

p. 0509

p. 0512

p. 0524

p. 0527

p. 0533

Acton Main Line

Booked To Wait
Crew Change (if necessary)

a. 0536

d. 0602

p. 0606

p. 0609

p. 0611

Hanwell Bridge Loop

Reversal / Run Around

a. 0614

d. 0713

p. 0714

p. 0717

p. 0720

p. 0725

Schedule Info

Departing Fri 17/01/2025
Created Wed 25/09/24 20:17
Validity 16/12/24 until 16/05/2025
Schedule ID H47694 (10467403)
Schedule Type WTT
Duration 02 hrs 54 mins

Train Info

Operated By DB Cargo
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2000
Service Type Aggregates (B4)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 57121020
Flow Info DBC UK: Angerstein Wharf to Various
Member Info Log In