Train 6M51 Attercliffe Sdgs Ews to Peak Forest Cemex Sdgs

Operated By DB Cargo, Runs Only If Required

Brightside Up/dn East Slow

Reversal / Run Around

a. 0453

d. 0513

p. 0517

p. 0522

Heeley Up Loop

Booked To Wait

a. 0528

d. 0535

p. 0538

p. 0539

Totley Tunnel East

1min Pathing Allowance

p. 0541

Bamford

1min Eng. Allowance

p. 0551

Earles Sidings Sig Es31

5min Pathing Allowance

p. 0558

p. 0605

p. 0612

Peak Forest S.B.

Crew Change (if necessary)
Driver Changes Ends
Shunting Move
Stops For Operating Reasons

a. 0625

d. 0631

Peak Forest Cemex Sdgs

Shunting Move

a. 0641

Schedule Info

Departing Wed 05/02/2025
Created Wed 25/09/24 20:17
Validity 17/12/24 until 16/05/2025
Schedule ID H47387 (10492214)
Schedule Type WTT
Duration 01 hrs 55 mins

Train Info

Operated By DB Cargo
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 600
Service Type Aggregates (B4)
Characteristics Runs as required
Runs to Terminals/Yards as required
Service Code 52160348
Flow Info DBC UK: Peak Forest - Attercliffe
Member Info Log In