Train 6R95 Willesden Eurotermnal Gbrf to New Bilton (Jarvis)

Operated By Freightliner, Runs Only If Required

p. 0156

Wembley Yard South Jn.

2min Pathing Allowance

p. 0159

p. 0203

a. 0206

d. 0209

p. 0213

Tring

2min Eng. Allowance

Plat 3 SL

p. 0248

p. 0257

p. 0306

Denbigh Hall South Jn

4min Eng. Allowance

p. 0307

Hanslope Jn

2min Eng. Allowance

p. 0325

p. 0358

Daventry North Jn

1min Eng. Allowance

p. 0406

p. 0409

p. 0411

Schedule Info

Departing Thu 13/03/2025
Created Fri 06/12/24 21:41
Validity 24/12/24 until 16/05/2025
Schedule ID H45676 (11242330)
Schedule Type WTT
Duration 02 hrs 28 mins

Train Info

Operated By Freightliner
Timed For 60mph
Power Type Diesel Locomotive
Timing Load 2000
Service Type Aggregates (B4)
Characteristics Runs to Terminals/Yards as required
Service Code 57622980
Flow Info Aggregates
Member Info Log In